About 90 ships in Sulina raid: freight rates may increase after attacks

As of November 16, about 90 ships are waiting at the Sulina roadstead, and the queue to enter Danube ports has stretched far beyond the roadstead. Due to the recent attacks on merchant ships, freight rates on Danube routes may increase.
This was reported by Danube logistics expert Kateryna Kononenko.
According to her, after recent incidents near the Sulina Canal, shipowners may reconsider the conditions of operation on Danube routes.
“The Sulina roadstead can no longer be considered a safe place to wait. Now it will be much more difficult to convince shipowners that waiting on the way to Galați or Giurgiulești is safe,” Kononenko noted.
The expert suggests that the usual freight rates for transportation to Galați in Romania and Giurgiulești in Moldova may lose relevance due to the worsening security situation.
At the same time, for Ukrainian Danube ports, the main factor in the increase in transportation costs remains the long wait for passage through the Sulina Canal.
According to Kononenko, currently the waiting time for ships heading to Ukrainian ports is 40-60 days. For ships heading to the ports of Romania and Moldova, this figure is 7-14 days.
The expert also provided current figures for the maximum safe draft for passage along the Danube routes. In particular, on Sulina it is 7.01 m, at the mouth of Bystre – 5.3 m, on the section from the 44th mile to Izmail – 6.8 m. On the route from the 44th mile through Reni to Galați, the permissible draft is 6.7 m, and on the section Galați – Breila – 6.3 m.
Recall that on November 14-15, drones attacked three merchant ships near the Sulina Canal: the tanker EVIAPETROL V, the bulk carrier Marsol and the tanker Ali Najafov. The Romanian authorities confirmed these incidents and reported that the crew members were not injured.
Earlier, USM reported that as of November 9, about 95 ships were waiting at the Sulina roadstead, and about 30 more were waiting in line to exit the Danube. According to Kononenko’s estimate at the time, it would take at least 10 days to reduce the queue to a minimum, assuming ten ships passed through the canal daily.
