Construction of a new road to the port continues in Odesa
In Ukravtodor they talked about the construction progress of the future road to the Odesa Commercial Sea Port.
The Road Service in the Odesa region has started the construction of drill poles for a new overpass. According to the plan, it will be connected to the existing USPA flyover.
In addition, during the construction work, the foundation of the road was strengthened with 147,088 m3 of geotextiles and 150 thousand tons of sand.
As USM previously reported, the new road to the Odesa port will be made of cement concrete, and its length will be 5.3 km. Within the framework of the project, it is planned to build two WIM systems, as well as a parking area for trucks, designed for 300 vehicles. All the details about the construction of a new access road to the port, as well as about the reconstruction of the highways that lead to the ports of Big Odesa, read in an interview with USM with the Chief road worker of the Odesa region Dmytro Rybalka.