Berths

The head of “Allseeds” proposed to increase tariffs for USPA berths by 5-10 times
The head of Allseeds Group, Vyacheslav Petryshche, proposed to increase the tariffs for using USPA berths by 5-10 times.
20.08.2024 - 15:59

In the port of Klaipeda, berths for grain loading were reconstructed
In the Lithuanian port of Klaipėda, the last stage of reconstruction of berths for loading agricultural products was completed.
10.08.2023 - 10:00

Berths of the river station on the Dnipro are being sold for 4 million
In Kremenchuk, passenger berths of the river station on the bank of the Dnipro are being sold for UAH 4 million.
14.07.2023 - 16:40

USPA is looking for contractors to repair berths for UAH 780 million again
The Pivdennyi Port Authority has announced a second tender for the overhaul of berths No. 5 and No. 6.
4.02.2022 - 10:40

USPA did not find contractors to repair two berths in the Yuzhny port
The USPA failed to find contractors for the repair of berths No. 5 and No. 6 of SE “CSP Yuzhny” with a total cost of UAH 783.4 million (USD 27.5 million).
20.01.2022 - 11:45